The clients purchased the home specifically with the intention of remodeling it. Telos was involved during the purchasing process, consulting with them to determine whether the property was suitable for the outcome they wanted.
Before the purchase, key considerations included the type of construction, foundation integrity, and access to the home’s mechanical systems.
The homeowners are a retirement-age couple, and the wife has mobility issues. She currently uses a walker, and a wheelchair is likely to be needed in the future. This became one of the main constraints around which the home was designed. The goal wasn’t simply to update the appearance of the house, but to create a home that could continue working for them as their needs change. The primary bedroom was also designed with enough space to accommodate the possibility of future in-home care, resulting in a relatively large primary bedroom considering the overall size of the house.
The guest bathroom was redesigned in order to enlarge the primary bathroom. A window was shortened to accommodate its new location within the shower area. These spaces were designed not only around appearance, but also around accessibility, comfort, and the homeowner’s specific mobility needs.
Several existing windows were removed and new windows were added. Telos also added a new exterior door from the living room to provide direct access to the backyard. Previously, the homeowners had to travel through the garage and then through the sunroom to reach the backyard. This change significantly improved the path of travel and accessibility within the home.
The house had old plumbing and electrical systems, with the existing electrical system being extremely unsafe.
The mechanical systems were also centrally located as part of the redesign.
Sound barriers were added around:
The goal was to keep noise transfer to a minimum.
Thermal breaks were also added to the exterior wall in the primary bathroom to help prevent the tile from becoming extremely cold during the winter.
Thermal breaks were also added to the exterior wall in the primary bathroom to help prevent the tile from becoming extremely cold during the winter.
This project went far beyond updating an older home
The clients needed a house that could be transformed around their lifestyle, current mobility limitations, and potential future accessibility and in-home care needs.
Telos became involved before the purchase to help determine whether the property could support that vision. From there, the entire home was redesigned around safer movement, accessibility, durability, comfort, modern functionality, and long-term use. At the same time, Telos addressed major underlying issues—including unsafe electrical, aging plumbing, mechanical-system placement, sound transfer, thermal comfort, and difficult access to the backyard—while completely remodeling and modernizing the home.
The project took approximately 10 months.
However, Matthew noted that the project was completed largely by him and one helper, so the 10-month timeline should not be presented as representative of how long Telos would expect a similar project to take today, now that the company has three craftsmen on the team.
See what homeowners in Topeka and the surrounding areas are saying about their experience with Telos Construction.